MakingSpaceforNAture_2_Farmland_3_Flowers_Full Copy 1 Aspect Ratio 1200 400

Defining our priorities for nature

The starting point for the development of the Kent and Medway Local Nature Recovery Strategy was to determine the key issues it needed to consider when setting priorities for nature recovery – what the Strategy should be responding to and the actions needed to address them. At a series of workshops, stakeholders identified pressures, threats and challenges facing the county’s biodiversity both now and anticipated in the future.

At the same time as determining the pressures and challenges for the county, stakeholders also outlined the outcomes they would like to see for nature – what a county with recovered habitats and restored species populations would look like. This created the initial longlist of potential priorities.

Criteria to aid the prioritisation of this longlist was developed, with input from stakeholders to ensure it was a fair and equitable selection process. Refinement against the criteria selected priorities that:

  • were within the scope of the Local Nature Recovery Strategy remit and ability to affect
  • addressed key pressures and challenges
  • related to habitats and/or species of national or local significance
  • contributed to national targets and/or supported local targets (as identified by the review of national and local strategies and plans – see Part 2, Chapter 6 for further details)
  • were urgent, related to climate change vulnerability and/or presented opportunity for nature-based solutions

Further workshops were held to review the draft priorities. Although this did not lead to any further refinement, it did confirm that the priorities provided the right focus for nature recovery in the county.

Reports from this stage of the Strategy's development

MS4N Pressures and Priorities Workshops Report – Part 1 Pressures

Download PDF (2 MB) - MS4N Pressures And Priorities Workshops Report Part 1 Pressures LR

Brainstorm Aspect Ratio 480 320

MS4N Pressures and Priorities Workshops Report – Part 3 Out of Scope

Download PDF (1 MB) - MS4N Pressures And Priorities Workshops Report Part 3 Out Of Scope Pressures LR

IMG 20240201 WA0020 Aspect Ratio 480 320

MS4N Priorities Shortlisting Approach – Revised following Feedback

Download PDF (1 MB) - MS4N Priorites Shortlisting Approach Revised Following Feedback Adopted

981 3 2 Scaled Aspect Ratio 480 320

Creating the Kent and Medway LNRS Draft Priorities Shortlist – What Was Our Process?

Download PDF (1 MB) - Creating The Kent And Medway LNRS Draft Priorities Shortlist Apr 24

Photo 24 04 2022 10 57 36 1 1 Scaled Aspect Ratio 480 320

MS4N Kent and Medway LNRS Priorities shortlisting workshops report July 2024

Download PDF (665 KB) - MS4N Kent And Medway LNRS Priorities Shortlisting Workshops Report July 2024

Photo 02 05 2024 11 20 47 Scaled Aspect Ratio 480 320

MS4N Kent and Medway LNRS Priorities shortlisting workshops voting report July 2024

Download PDF (797 KB) - MS4N Kent And Medway LNRS Priorities Shortlisting Workshops Voting Report July 2024

Photo 07 05 2024 13 27 06 2 Scaled Aspect Ratio 480 320

MS4N – Redrafted Kent and Medway LNRS priorities report July 2024

Download PDF (357 KB) - MS4N Redrafted Kent And Medway LNRS Priorities Report July 2024

Thick Thighed Beetle Scaled Aspect Ratio 480 320

Kent & Medway LNRS Priorities and measures draft 1.2 July-24

Download PDF (890 KB) - Kent & Medway LNRS Priorities And Measures Draft 1.2 July 24

Ranscombe Butterflies 1 Aspect Ratio 480 320